HEPA Air Scrubbers on Construction Jobs: What They Cannot Do

A running HEPA air scrubber is not proof that dust is under control. Learn what a HEPA air scrubber does, why it is a filter and not a barrier, and the field mistakes that undermine it.
Construction Containment Inspection Checklist: What to Check and What to Do When It Fails

Teaser for the free gated Construction Containment Inspection Checklist and companion to the plastic sheeting vs modular walls post. Explains what CDC/HICPAC guidance, CMS QSO-22-20, the ASHE ICRA 2.0 permit template and the UC Davis Health standard say about inspecting and monitoring containment, why pressure targets must come from your permit or facility policy, what each monitoring method does and does not tell you, a four-moment inspection routine, a response sequence when containment fails, and what changes for rigid panels vs plastic film. Drives readers to the checklist form page.
Why Plastic Sheeting Can Fall Short as Containment in Regulated Construction Environments

Gives GCs, facility managers and owners a balanced, sourced look at plastic sheeting containment. It covers what CDC and ASHE ICRA 2.0 actually say (plastic is allowed for short, minimal-dust work, and CDC recommends rigid barriers for long-term projects), the recognized failure points (edges, floor line, movement under negative air, zipper doors, penetrations, punctures, removal), documented construction-related fungal outbreaks, fire standards that get confused (NFPA 241, NFPA 701, ASTM E84 vs a rated assembly), life sciences, data center and occupied office risks, Cal/OSHA silica, where modular walls hold up better, a failure-cost framework, waste and CALGreen, when plastic is a reasonable choice, and a checklist of questions to ask before accepting poly as the barrier.